Banner Image Missing
Bridge Repair Scheduled in the Broward Municipal Services District
  
- Work to begin November 14 -
  

BROWARD COUNTY, FL - Highway and Bridge Maintenance Division (HBMD) will be performing major bridge rehabilitation on a County-owned bridge on NW 27th Avenue over C-12 Canal (North Folk New River) between NW 6th Street and West Sunrise Boulevard in the Broward Municipal Services District (see attached map). The work is scheduled to begin on November 14, 2022 and will conclude by May 2023, barring any unforeseen conditions and/or weather delays. This project is funded by the Gas Tax.

The recommended repairs identified by the Florida Department of Transportation will enhance the longevity of the structure by using an innovative deck strengthening design and construction method developed by HBMD. This method, one of the first in Florida, minimizes construction impacts to the public by mainly working on the underside of the bridge. Watch video of new bridge repair method.

Most of the construction will be performed without lane closures, except for a one-week period where the deck waterproofing and asphalt resurfacing will take place and access to driveways and sidewalks will be maintained. Variable message signs will be posted to advise affected motorists and pedestrians.

Project Manager Delin Bixha can be reached at 954-357-4991 or dbixha@broward.org. You can also contact Highway and Bridge Maintenance Division at 954-357-6040.

Broward County appreciates your patience as we complete this necessary bridge repair project.

About Highway and Bridge Maintenance Division
The Highway and Bridge Maintenance Division maintains and improves the County's highway/street system, operates drawbridges, and oversees mosquito control operations. The Division is responsible for cleaning and mowing rights-of-way, street patching and resurfacing, intersection improvements, canal maintenance and construction, guardrail maintenance, bridge maintenance, street cleaning and stormwater drainage improvements.

November 2, 2022
MEDIA CONTACT: Anh Ton 
Highway and Bridge Maintenance Division
954-357-6040

AttachmentDownload
Project Map.jpg