Banner Image Missing
Bridge Rehabilitation and Drainage Improvements in Davie
  
- Work to begin April 20 -
  

BROWARD COUNTY, FL – The Highway and Bridge Maintenance Division will be performing minor bridge rehabilitation work and drainage improvements at Davie Road between Griffin Road and Orange Drive in Davie (see map attached below) beginning April 20, 2021. The project is expected to conclude in September 2021, barring any unforeseen conditions and/or weather delays. 

The purpose of the project is to perform the following: concrete damage repair, joint restoration, surface cleaning and painting, fence installation, and roadway drainage improvements. To minimize construction impacts to the nearby businesses and residents, most of the work will be completed during off-peak traffic hours.

During construction, one lane of traffic will be closed in both directions of Davie Road and Orange Drive between 9AM and 4PM. At least one lane will remain open in each direction. Access to businesses and sidewalks will be maintained and variable message signs will be posted to warn motorists and pedestrians.

Highway and Bridge Maintenance Division can be reached at 954-357-6040. Project Manager, Stanley Bateman, can be reached at (954) 647-6490 or  sbateman@broward.org.

Broward County appreciates your patience as we complete this necessary roadway maintenance project.

About Highway and Bridge Maintenance Division
The Highway and Bridge Maintenance Division maintains and improves the County's highway/street system, operates drawbridges, and oversees mosquito control operations. The Division is responsible for cleaning and mowing rights-of-way, street patching and resurfacing, intersection improvements, canal maintenance and construction, guardrail maintenance, bridge maintenance, street cleaning, and stormwater drainage improvements.

April 9, 2021
MEDIA CONTACT: Adriana Toro        
954-357-6064
Atoro@Broward.org

AttachmentDownload
62822-ORANGE DR AND DAVIE RD.pdf